TVP Engineering Ltd TVP specialists in structural vibration

Rafael Mendoza Bridge

2824 meter long bridge composed of two main sections, with twelve spans and eleven piers crossing the Daule River and twenty-seven spans and twenty-five piers crossing the Babahoyo River

Location: Guayaquil, Ecuador

Date built: 1964

Date of test: March 2001

Purpose of Test: The purpose of this study was to determine key dynamic characteristics of the bridge, which is being upgraded to accommodate two lanes of traffic, and will also undergo a seismic retrofit.


Deltaport Way Bridge